![]() In stage one of the project (the basic evaluation and preliminary design), the engineers developed different variants for the road and bridge design. ![]() ![]() Within the scope of the project, AFRY was entrusted with the design and structural planning of the new bridge, the road planning as well as the site planning for the deconstruction of the temporary bridge. Optimum load transfer with the smallest possible dimensions What is interesting is that the engineers are planning the project using the BIM method – and completely voluntarily. ![]() However, the latter’s intended lifespan of 30 years will soon be reached, which is why the construction of a new replacement for the Altglienick bridge is now urgent. Since 1995, the dilapidated structure is no longer passable and only serves as a pipeline support, while a makeshift bridge handles the traffic over the canal. It was built between 19, then rebuilt as an exact replica in 1950. In Berlin-Treptow, a single-link steel truss bridge crosses the Teltow Canal. Because it makes their work more efficient, the engineers from AFRY Germany decided to use Building Information Modelling (BIM) for planning the Altglienicker Bridge in Berlin even though there was no contractual obligation to
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |